Resources

 

We’ve compiled a series of resources to help keep you updated on the latest reports and actions surrounding the Anniston site. Scroll down to browse and download any information you may need.

November progress report

2025

Download
2020 Annual Groundwater Detection Monitoring and Corrective Action Effectiveness Report

2020

Download
2021 annual groundwater detection monitoring and corrective action effectiveness report

2021

Download
2022 annual groundwater detection monitoring and corrective action effectiveness report

2022

Download
2023 annual groundwater detection monitoring and corrective action effectiveness report

2023

Download
A02 - Dredge spoil area evaluation report

1998

Download
A03 - Dredge spoil area RFICS phase 1

1999

Download
A04 - Corrective measures study

2000

Download
A05 - RFI results and IM plan

2000

Download
A06 - IM plan softball fields

2001

Download
A07 - Excavated stockpiled soil removal action work plan

2001

Download
A08 - Corrective measures report softball complex

2001

Download
A09 - Prime properties soil sampling

2001

Download
A10 - Prime properties cover material sampling

2001

Download
A11 - RCRA facility investigation results and IM plan

2002

Download
A12 - Excavated soil stockpile corrective measures study

2002

Download
A13 - Corrective measures study approval

2002

Download
A14 - Softball Parking Lot IM Report

2002

Download
A15 - BMP plan construction of soil cap

2002

Download
A16 - ADEM authorization Oxford lake park

2002

Download
A17 - Excavated stockpiled soil corrective measures implementation work plan

2003

Download
A18 - Tennis court IM report

2003

Download
A20 - Softball complex IM report

2004

Download
A21 - Highway phase 1 completion report

2004

Download
A22 - Final corrective measures implementation plan report

2007

Download
A23 - Phase I/phase II construction interim remedial measures report

2008

Download
A25 - West abutmen sampling data

2011

Download
A26 - Utility construction completion report

2011

Download
A27 - Softball complex lightning and drainage upgrades

2012

Download
A28 - Dredge spoil evaluation report

2012

Download
A29 - Former holiday inn redevelopment completion report

2013

Download
A30 - O&M plan for action projects

2014

Download
A31 - Miracle field construction completion report

2014

Download
A32 - Remedial measures completion report

2014

Download
A33 - Maintenance building completion report

2017

Download
A34 - Proposed dewatering facility construction support work plan

2018

Download
Appendix A - Alternative removal action workplan

2013

Download
Appendix B - Remedial areas using a nonresidential soil PRG of 9 mglkg

2013

Download
Appendix C - Fish consumption survey results

2009

Download
Appendix C - Remedial areas using a sediment PRG of 1 mglkg

2016

Download
Appendix D - Conceptual soil management plan

2016

Download
Appendix D - OU-4 fish collection data report

2009

Download
Appendix E - Choccolocco creek intensive water quality and biological study

1997

Download
Appendix E - Cost estimate tables for a nonresidential soil PRG of 9 mglkg

2000

Download
Appendix F - Chemistry data report for sediment and bioaccumulating testing

2011

Download
Appendix F - Cost estimate tables for a sediment

2000

Download
Appendix G - OU-4 phase 1 ecological survey report

2007

Download
Appendix H - OU-4 sediment stability technical memo

2010

Download
Appendix I - Anniston integrated HHRA

2013

Download
Appendix J1 - BERA transmittal letter

2016

Download
Appendix J2 - Anniston PBC site BERA volume I

2016

Download
Appendix J3 - Anniston PBC Site BERA Volume II

2016

Download
Appendix J6 - OU-4 responses to USEPA's comments on the OU-4 BERA

2016

Download
Appendix K1 - BERA addendum approval

2018

Download
Appendix K2 - BERA addendum

2019

Download
April progress report 2020

2020

Download
April progress report 2021

2021

Download
April progress report 2022

2022

Download
April progress report 2023

2023

Download
April progress report 2024

2024

Download
April progress report 2025

2025

Download
August progress report 2020

2020

Download
August progress report 2021

2021

Download
August progress report 2022

2022

Download
August progress report 2023

2023

Download
August progress report 2024

2024

Download
August progress report 2025

2025

Download
December 2025 Monthly Report Final

2025

Download
December progress report 2020

2020

Download
December progress report 2021

2021

Download
December progress report 2022

2022

Download
December progress report 2023

2023

Download
December progress report 2024

2024

Download
February progress report 2020

2020

Download
February progress report 2021

2021

Download
February progress report 2022

2022

Download
February progress report 2023

2023

Download
February progress report 2024

2024

Download
February progress report 2025

2025

Download
January Monthly Report 2026

2026

Download
January progress report 2020

2020

Download
January progress report 2021

2021

Download
January progress report 2022

2022

Download
January progress report 2023

2023

Download
January progress report 2024

2024

Download
January progress report 2025

2025

Download
July progress report 2020

2020

Download
July progress report 2021

2021

Download
July progress report 2022

2022

Download
July progress report 2023

2023

Download
July progress report 2024

2024

Download
July progress report 2025

2025

Download
June progress report 2020

2020

Download
June progress report 2021

2021

Download
June progress report 2022

2022

Download
June progress report 2023

2023

Download
June progress report 2024

2024

Download
June progress report 2025

2025

Download
March progress report 2020

2020

Download
March progress report 2021

2021

Download
March progress report 2022

2022

Download
March progress report 2023

2023

Download
March progress report 2024

2024

Download
March progress report 2025

2025

Download
May progress report 2020

2020

Download
May progress report 2021

2021

Download
May progress report 2022

2022

Download
May progress report 2023

2023

Download
May progress report 2024

2024

Download
May progress report 2025

2025

Download
Non-remedial action completion report

2018

Download
November progress report 2020

2020

Download
November progress report 2021

2021

Download
November progress report 2022

Download
November progress report 2023

2023

Download
November progress report 2024

2024

Download
OU-1/OU-2 Pre-Design Investigation Work Plan

2022

Download
OU-1/OU-2 Responses to EPA's Comments on the OU-1/OU-2 Feasibility Study

2016

Download
OU-1/OU-2 consent decree

2021

Download
OU-1/OU-2 feasibility study

2016

Download
OU-1/OU-2 feasibility study cover letter

2016

Download
OU-1/OU-2 pre-design investigation work plan EPA approval letter

2022

Download
OU-1/OU-2 pre-design investigation work plan cover letter

2022

Download
OU-1/OU-2 record of decision

2017

Download
OU-1/OU-2 remedial design work plan

2021

Download
OU-1/OU-2 remedial design work plan approval letter

2021

Download
OU-1/OU-2 remedial design work plan transmittal letter

2021

Download
OU-1/OU-2 remedial investigation

2015

Download
OU-1/OU-2 responses to EPA's comment on the pre-design work plan

2022

Download
OU-1/OU-2 responses to EPA's comments on the OU-1/OU-2 remedial design work plan

2021

Download
OU-3 Remedial Action Construction Completion Report

2017

Download
OU-3 Remedial Action Construction Completion Report 2nd Addendum

2021

Download
OU-3 Remedial Action Construction Completion Report Addendum

2018

Download
OU-3 consent cecree

2012

Download
OU-3 feasibility study report

2010

Download
OU-3 human health risk assessment

2008

Download
OU-3 interim record of decision

2011

Download
OU-3 remedial investigation addendum area a removal action

2010

Download
OU-3 remedial investigation addendum south landfill cap assessment and west landfill confirmation sampling

2010

Download
OU-3 remedial investigation report vol 1

2010

Download
OU-3 remedial investigation report vol 2

2010

Download
OU-4 FS RTC

2023

Download
OU-4 FS transmittal letter

2023

Download
OU-4 Feasibility Study

2023

Download
OU-4 RI approval

2019

Download
OU-4 RI cover letter

2019

Download
OU-4 Record of Decision - Logan Martin Lake

2024

Download
OU-4 Remedial Investigation

2019

Download
OU-4 feasibility study

2024

Download
OU-4 feasibility study addendum

2024

Download
OU-4 proposed plan

2024

Download
OU-4 proposed plan response to comments

2024

Download
OU-4 record of decision - Choccolocco creek

2024

Download
OU-4 remedial investigation responses to comments

2019

Download
October progress report

2025

Download
October progress report 2020

2020

Download
October progress report 2021

2021

Download
October progress report 2022

2022

Download
October progress report 2023

2023

Download
October progress report 2024

2024

Download
Off-site RCRA facility investigation (RFI) Report - Volume 1 of 4

2000

Download
Off-site RCRA facility investigation (RFI) report

2000

Download
Off-site RCRA facility investigation (RFI) report - Volume 4

2000

Download
Off-site RFI report - appendices vol 2 (appendix a, part 2)

2000

Download
Off-site RFI report - appendices vol 3 (appendices b, c, d)

2000

Download
Onsite RFI/CS report for the Anniston Alabama facility

2002

Download
Partial consent decree 2002

2002

Download
Partial consent decree 2002 Anniston

2002

Download
Partial consent decree 2002 Choccolocco

2002

Download
Partial consent decree 2002 Sitewide

2002

Download
Responses to ADEM Comments on the June 2000 Phase I RFI/CS Investigation Report

2000

Download
Screening level ecological risk assessment - Anniston plant

2005

Download
Screening level ecological risk assessment - Residential and non residential

2005

Download
Second five-year review report for Anniston PCB site

2025

Download
September monthly progress report 2025

2025

Download
September progress report 2020

2020

Download
September progress report 2021

2021

Download
September progress report 2022

2022

Download
September progress report 2023

2023

Download
September progress report 2024

2024

Download
Supplemental Work Plan for the Off-Site Portion of the RFI/CS Program

1999

Download
OU-1 OU-2 Predesign Investigation Evaluation Report

2025

Download